For General Contractors
One Less Thing to Chase
You're managing fifteen trades. Material supply shouldn't be the one that slips.
General contractors want three things from a material supplier and none of them are aesthetic. Miami Stone Veneer Specialists is built around exactly those three: an accurate number, a date we hold to, and a straight answer when something goes wrong.
The take-off
Send elevations. You'll get square footage, corner linear footage, and a piece count with waste allowance, free.
The corner number is the one that catches people. Corners are separate pieces at a separate price and typically add 10 to 15% over the field area. A subcontractor's take-off that only counts square feet will come back for more money mid-job, and if the top-up is a different batch you've got a colour problem as well as a commercial one.
Substitutions
Architects specify products we don't carry. It happens on most jobs.
Raise it early and we'll usually find a close match, put full-size samples in front of the architect, and get it approved as a substitution before it becomes a programme problem. Where there genuinely isn't an equivalent we'll tell you that too — pushing an approximation through and hoping nobody notices at handover helps nobody.
When something fails
Adhered veneer fails for a small number of reasons, and in our experience almost all of them are behind the stone rather than in it:
- Missing or single-layer drainage plane on framed construction
- Lath fastened into sheathing rather than framing
- No flashing at openings and roof junctions
- Film-forming sealer trapping vapour in the body
If a wall you built goes wrong, call us and we'll come and look. If it's our material we'll stand behind it. If it's the install we'll tell you that plainly, which is more useful to you than a vague answer when you're deciding who carries the cost.
Crews
We supply material, not labour. But we see whose walls hold up, so if you need a mason we'll point you at people we'd use. No fee either way.
Products specified for this
Manufactured Stone
The pillar of our range. Concrete stone that carries the colour, depth, and texture of quarried stone at a fraction of the weight and cost. Eight collections, 38 face formats, stocked locally.
View details →Stacked Stone
The most-specified profile we sell. Long, low courses that read as a clean horizontal band — the look behind most modern Miami feature walls and outdoor kitchen islands.
View details →Concrete Lattices
Breeze block is back, and Miami is where it belongs. Twenty-four patterns that filter sun, move air, and give a wall a shadow that changes all day.
View details →Related applications
Exterior Wall Cladding
The biggest surface on the job and the one that has to survive Miami weather. Here's what we stock for exterior elevations and how it's specified.
View details →Commercial Facades
Commercial work runs on submittals and delivery dates. We supply to schedule, with samples and spec sheets your architect can drop straight into the package.
View details →Columns
Columns are where cheap veneer gives itself away. Radiused pieces and tight formats wrap the corner instead of butting into it.
View details →Worth reading first
Stone Veneer Cost in Miami
Material, labour, prep, and sealer — broken out separately so you can see where the money actually goes.
View details →Stone Veneer for Florida Homes
A product that performs beautifully in Denver can fail in Homestead. What Florida changes about the spec.
View details →Can Manufactured Stone Get Mold?
Mold on stone is almost never a stone problem. It's a drainage-plane problem, and it starts behind the wall.
View details →Common questions
Can you hit a fixed delivery date? +
On stocked material, yes, and we'll commit to it. On non-stock, four to six weeks with a firm date once the order is placed. What we won't do is promise a date we can't hold to win the order.
Do you recommend installers? +
Yes, and we take no fee either direction, so the recommendation reflects who actually does good work rather than who pays us.
What if the architect specified something you don't carry? +
Tell us early. Often there's a close match in our range that we can present as a substitution with samples for the architect to approve. Sometimes there isn't, and we'll say so rather than pushing an approximation through.
Who's responsible if the veneer fails? +
Depends on the cause. Material defects are ours. Installation and substrate — which is nearly every failure we see — sits with the installing contractor. We'll happily inspect and tell you honestly which it is.
Get a take-off and a delivery date
Samples, take-offs, and pricing for projects across Miami and South Florida.